From the professional,
for the professional

A good end result starts with proper preparation. That's why we share our expertise on substrates, application, maintenance, and the use of our products.

Dryback is the most commonly used installation method. The adhesive is applied evenly, after which the PVC strips are laid precisely into the adhesive bed. The floor is then rolled, and the adhesive is allowed 24 hours to cure. Click-PVC is installed as a floating floor on a suitable subfloor. Start along a straight wall, maintain an expansion joint of 5–10 mm, and click the panels together at an angle.

Tips for Installing Your Floor

Maintenance Tips

Proper maintenance of your PVC floor extends its lifespan and preserves its appearance. Remove dust and dirt daily or every other day with a vacuum cleaner or soft broom to prevent scratches. Damp mopping can be done once or twice a week using a slightly damp mop and a pH-neutral PVC cleaner. For stubborn dirt or dull spots, periodic deep cleaning with a mildly alkaline cleaner is recommended.

For a complete guide with step-by-step instructions, cleaning tips, and recommended products, you can download the document here.

Combining PVC flooring with underfloor heating provides optimal comfort and pleasant warmth in your home or office. PVC is ideal for underfloor heating thanks to its good thermal conductivity and stable properties, allowing you to heat your space in an energy-efficient and comfortable way. For perfect results, it’s important to ensure the right subfloor, installation, and temperatures.

Tips for Underfloor Heating

For stubborn stains or damage, please contact your dealer for advice on the proper cleaning or repair method.